Impact Windows & Doors
Full-house impact windows in Miami typically install in 1–2 days. Pricing depends on opening sizes and frame type — most projects run $850 to $1,400 per opening installed, with significant insurance and energy savings on top.
We measure every opening, quote per opening, and handle the permit and inspection.
Last updated: · License holder: Arturo Stadthagen, Florida Certified Roofing Contractor CCC1333598

Overview
Impact windows and doors retire your storm shutters for good. The laminated glass takes a direct hit from windblown debris and stays in its frame, keeping wind and water out — and because the units are Miami-Dade NOA approved, they satisfy the hurricane code on their own.
Beyond the storm, they hush street noise, block the UV that fades your floors and furniture, and seal tight enough to lower your A/C bill. As an authorized installer for Eco Window Systems and Mr. Glass, we handle measurement, permit, installation and the final inspection from start to finish.
What it includes
- Miami-Dade NOA-approved laminated impact glass
- Authorized installer for Eco Window Systems and Mr. Glass
- UV-blocking, sound-dampening, hurricane-code compliant
- Permit, install, inspection — handled end-to-end

How it works
-
Measure & quote
We size every opening and quote frame styles and glass options.
-
Order
Custom units are built to spec — typically 6 to 10 weeks.
-
Installation
Most single-family homes are finished in 1 to 2 days.
-
Permit & inspection
We pull the permit and pass the county inspection for you.
Permits, timeline and warranties
Permits and code
- Window and door replacement is permitted work in Miami-Dade and Broward, with a final inspection. We pull the permit and schedule the inspector.
- Every unit needs a Miami-Dade NOA covering the glass, the frame and the anchoring method for your opening's design pressure. The NOA number belongs on your quote.
- Anchoring into the existing opening is what the inspector checks most closely; substituting a different fastener than the NOA specifies fails the inspection.
Warranties
- The manufacturer warrants the units — glass, frame and hardware terms come from Eco Window Systems or Mr. Glass and are handed to you with the product documents.
- Our written workmanship warranty covers the installation and the anchoring.
- Impact glass also blocks UV and dampens sound; those are properties of the product, documented by the manufacturer rather than promised by us.
How long it takes
One to two days of installation for a typical full-house project once the units arrive. Manufacturing and delivery of made-to-measure units is the long part of the schedule, and it is quoted before you order.
Questions to ask any contractor
- What is the NOA number for these units, and what design pressure is it rated for on my openings?
- Is the permit and the final inspection included in the quoted price?
- What is the lead time for manufacturing, and what happens if an opening is mis-measured?
- How will the openings be finished — stucco patch, caulking, interior trim?
Ask us the same four. We answer them in writing on every estimate.
Related reading
Our other services
Services
- Roof Replacement Full residential roof replacement — tile, metal and architectural shingle.
- Roof Repair Targeted repairs — leaks, slipped tiles, flashing, storm damage.
- Commercial Roofing Flat, low-slope and metal commercial systems — TPO, modified bitumen, standing seam.
- Hurricane Protection HVHZ-rated systems, secondary water barriers and wind mitigation reports.
- Exterior Paint Stucco prep, crack repair and elastomeric paint systems built for South Florida sun and humidity.
By roof type
- Tile Roofing Clay and concrete tile roofs, installed, repaired and lift-and-relayed to HVHZ code.
- Metal Roofing Metal roof installation and repair, specified for salt air and the HVHZ.
- Shingle Roofing Architectural shingle installation, repair and replacement built to Miami-Dade HVHZ code.
- Flat Roofing Flat and low-slope roof repair and replacement in TPO and modified bitumen.
- Roof Painting & Coating Roof painting and coating for sound tile and flat roofs, with the roof checked and repaired first.
Questions about impact windows & doors
-
Are impact windows really worth it in Miami?
For most Miami homes, yes — they replace shutters, satisfy the hurricane code, lower insurance, reduce A/C bills, and cut street noise. The payback period is usually 6–10 years on insurance alone.
-
How long does a full-house install take?
Most single-family homes finish in 1–2 working days once materials arrive. Lead time on custom-sized openings is typically 6–10 weeks from order.
Not the right fit if…
Art's Roofing & Construction repairs and replaces roofs in Miami-Dade, Broward and Palm Beach, under permit, with its own crews. We are probably not the right call if:
- You want the work done without a permit, or the permit pulled in your own name. Every roof replacement here needs a building permit, and it is pulled under our licence (CCC1333598), never the homeowner's.
- You want a product without a Miami-Dade approval. In the High-Velocity Hurricane Zone we install only products with a Miami-Dade Notice of Acceptance or a Florida Product Approval for HVHZ.
- You need a firm repair price before anyone has seen the roof. A leak repair is priced after we find the source. The written estimate is free.
- You want paint or a coating on a roof that is failing. Painting only pays off on a roof that is still sound. We inspect first and tell you if it is not.


